The West Bengal Power Development Corporation Limited (WBPDCL) is the primary state-owned power generation utility in West Bengal. In recent years, it has transformed into one of India’s most efficient coal-based producers, achieving record-breaking operational and financial performance. Current Generation Portfolio

: Real-time generation data for WBPDCL units is integrated into the NPP Dashboard

This article explores the capacity, technology, and methods used by WBPDCL to track and manage its power generation in real-time. 1. Overview of WBPDCL Power Stations

WBPDCL uses real-time generation tracking to monitor every megawatt (MW) produced across its power stations. This live data helps grid operators respond immediately to sudden drops in generation or unexpected surges in consumer demand. Core Technology Behind Live Monitoring

The corporation is aggressively expanding into solar, notably commissioning the at Sagardighi (5 MW) wbpdcl real time generation

WBPDCL's focus on real-time management has driven a remarkable turnaround in its operational performance, making it a national leader in efficiency.

An overall Plant Load Factor of 88.9% in 2024-25, far exceeding the national average of ~70%.

: An internal unified login portal specifically for tracking generation and operational data across the corporation's facilities. Generation Highlights (FY 2024-25)

WBPDCL has turned to advanced digital tools to elevate its operations, most notably through the deployment of , integrated with artificial intelligence (AI) and machine learning (ML) . This initiative, first implemented at the Santaldih Thermal Power Station (TPS), creates a virtual, real-time replica of the physical plant. Core Technology Behind Live Monitoring The corporation is

Sudden drops in real time generation across multiple WBPDCL units often point to fuel supply issues from ECL (Eastern Coalfields). For instance, in summer 2024, real time data showed two units at Kolaghat operating at 50% capacity due to low coal stock – a leading indicator of power cuts.

Root cause of 20:00 deviation: Coal feeder jam in Unit-3. Real-time alarm triggered, operator restored within 18 minutes.

Supervisory Control and Data Acquisition (SCADA) systems and Programmable Logic Controllers (PLCs) continuously log parameters such as: Turbine speeds Steam pressures Live megawatt (MW) output 2. The PRAYOG ERP Framework

: Four thermal power plants (Bakreswar, Santaldih, Sagardighi, and Kolaghat) were ranked among the top ten coal-based stations nationwide. External Real-Time Monitoring Auxiliary Consumption) for all plants (KTPS

One of the oldest units, requiring precise monitoring for efficiency.

Snapshot at 14:30 hours on a weekday (Summer)

: Provides detailed year-over-year generation parameters (MU, PLF, Auxiliary Consumption) for all plants (KTPS, BkTPP, BTPS, STPS, SgTPP).

Historically, power plants relied on manual logging and hourly updates. Today, WBPDCL utilizes advanced Supervisory Control and Data Acquisition (SCADA) systems, Distributed Control Systems (DCS), and computerized Energy Management Systems (EMS). These technologies capture live telemetry data directly from plant generators and stream it to a centralized dashboard. Key Metrics Tracked in Real Time: